Files
2026-10-03 00:00:45 -03:00

1.8 KiB

Ordem recomendada de execução

Pacote A — Fundação

  1. prompts/00_repo_discovery_and_guardrails.md
  2. prompts/01_architecture_and_adrs.md
  3. prompts/02_database_schema_rls_migrations.md
  4. prompts/03_auth_workspace_permissions.md
  5. prompts/04_design_system_and_app_shell.md

Gate A: typecheck/lint/test/build verdes; cross-tenant básico validado; ADRs críticos registrados.

Pacote B — Modelos de Proposta

  1. prompts/05_models_domain_list_capacity.md
  2. prompts/06_model_upload_analysis_pipeline.md
  3. prompts/07_model_field_review_activation_versioning.md
  4. prompts/08_model_lock_autosave_archive_delete.md

Gate B: fluxo de Modelos P0/P1 funcional, incluindo 10/10, lock, reprocessamento, ativação e V2+.

Pacote C — Propostas

  1. prompts/09_proposals_home_and_selection.md
  2. prompts/10_proposal_editor_dynamic_fields_preview.md
  3. prompts/11_proposal_autosave_lock_save_exit_model_switch.md
  4. prompts/12_validate_generate_async_idempotency.md
  5. prompts/13_versioning_history_download.md

Gate C: 4.1 → 4.2 → 4.3 completo; falhas não criam versões parciais; retry/duplo clique é idempotente.

Pacote D — Comunicação, observabilidade e integração

  1. prompts/14_email_audit_sentry.md
  2. prompts/15_cro_prefill_integration.md

Gate D: auditoria ponta a ponta; e-mail usa o PDF exibido; CRO não é dependência do fluxo standalone.

Pacote E — Qualidade e release

  1. prompts/16_testing_security_accessibility.md
  2. prompts/17_performance_resilience_hardening.md
  3. prompts/18_release_ci_cd_runbook.md
  4. prompts/19_final_gap_audit.md

Gate final: Definition of Done do MVP atendida, pendências remanescentes explicitamente registradas e nenhum comportamento não aprovado inventado.