# Ordem recomendada de execução ## Pacote A — Fundação 1. `prompts/00_repo_discovery_and_guardrails.md` 2. `prompts/01_architecture_and_adrs.md` 3. `prompts/02_database_schema_rls_migrations.md` 4. `prompts/03_auth_workspace_permissions.md` 5. `prompts/04_design_system_and_app_shell.md` **Gate A:** typecheck/lint/test/build verdes; cross-tenant básico validado; ADRs críticos registrados. ## Pacote B — Modelos de Proposta 6. `prompts/05_models_domain_list_capacity.md` 7. `prompts/06_model_upload_analysis_pipeline.md` 8. `prompts/07_model_field_review_activation_versioning.md` 9. `prompts/08_model_lock_autosave_archive_delete.md` **Gate B:** fluxo de Modelos P0/P1 funcional, incluindo 10/10, lock, reprocessamento, ativação e V2+. ## Pacote C — Propostas 10. `prompts/09_proposals_home_and_selection.md` 11. `prompts/10_proposal_editor_dynamic_fields_preview.md` 12. `prompts/11_proposal_autosave_lock_save_exit_model_switch.md` 13. `prompts/12_validate_generate_async_idempotency.md` 14. `prompts/13_versioning_history_download.md` **Gate C:** 4.1 → 4.2 → 4.3 completo; falhas não criam versões parciais; retry/duplo clique é idempotente. ## Pacote D — Comunicação, observabilidade e integração 15. `prompts/14_email_audit_sentry.md` 16. `prompts/15_cro_prefill_integration.md` **Gate D:** auditoria ponta a ponta; e-mail usa o PDF exibido; CRO não é dependência do fluxo standalone. ## Pacote E — Qualidade e release 17. `prompts/16_testing_security_accessibility.md` 18. `prompts/17_performance_resilience_hardening.md` 19. `prompts/18_release_ci_cd_runbook.md` 20. `prompts/19_final_gap_audit.md` **Gate final:** Definition of Done do MVP atendida, pendências remanescentes explicitamente registradas e nenhum comportamento não aprovado inventado.